Issue 11
Shape armhole
Repeat last 2 rows 8 (8, 10 , 10, 12, 12) more times, removing marker once slipped st is consumed by decrease.Back
Shape armhole
Repeat last 2 rows 8 (8, 10 , 10, 12, 12) more times. When the stitches come to the marker position, knit the last two rows of reduced stitches on the RM back armhole 8 more times (8, 10 , 10, 12, 12).
1. Missing some of chart keys in Abbreviations page.
BC: back cross. Place the next st onto a cable needle , hold at back of work, K2, then K1 from the cable needle.
FC: front cross. Place the next 2 sts onto a cable needle, hold at front of work, K1, then K2 from the cable needle.
T2F: twist 2 front. Place the next st onto a cable needle, hold at front of work, P1, then K1 from the cable needle.
T2B: twist 2 back. Place the next st onto a cable needle, hold at back of work, K1, then P1 from the cable needle.
C4F: cable 4 front. Place the next 2 st onto a cable needle, hold at front of work, K2 from the left needle, K2 from the cable needle.
C4B: cable 4 back. Place the next 2 st onto a cable needle, hold at back of work, K2 from the left needle, K2 from the cable needle.
S2kp on Rows 1, 3, 5, 7, 9 and 165.
P1 on Row 2, 4, 6, 8, 10
Row 38, 8th stitch from the left and Row 98, 7th stitch from the right. Work RS-K instead of WS-P.
Row 110, 3rd stitch from the right. Work RS-K.
Row 110, 5th stitch from the right. Work RS-P.
See the new chart after row 147. (Old version had one extra stitch right next to spine.)
BC: Intersection of upper left 2 eyes and front 1
FC: Intersection of upper right 2nd and front 1st
C4F: Intersection of 2nd upper right and 2nd front
C3B: Intersection of upper left 2 eyes and front 2 eyes
T2B: Intersection of 1st top left and 1st back
T2F: Intersection of 1st top right corner and 1st back corner
Dan 1, 3, 5, 7, 9, 165 - Sl2, K1, P2sso
Stages 2, 4, 6, 8, 10 - P1
Both row159 and row161 rightmost cables are FC (currently row159 is T3F and row161 is FC).
The 8th row from the left of row38 and the 7th row from the right of row98 are RS-K/WS-P (black dots are attached).
The 3rd from the right of row 110 is RS-K and the 5th is RS-P (currently they are reversed).
The eye on the right side of the shawl spine after row 147 is 1 stitch longer. Please see the new chart here.
[Newman]
In schematic, arrows on sleeves were pointed the wrong way.
This sweater is worked Left sleeve to Right sleeve.
The arrows in the scheme were pointing in the opposite direction. Correctly, knit from the left sleeve to the right sleeve.
P.72 left column
After those repeats , moving forward to chart II, work row 1 to 102.
Read as: After those repeats, maintaining Chart A & C as established, moving forward to chart II, work chart II -1, chart II -2, then Row 1-21 onto Row 1-12 of chart II - 3.
P.72 left column
Hem XS to 3XL:
Row 1 (RS Row 103 of chart II) Read as: Row 1 (RS, Row 13 after the last increase of chart II-3)
P.73 right column
Repeat last 2 rows 4 more times. Ending with Row 114 of chart II.
Read as: Repeat last 2 rows 4 more times, ending with Row 24 after the last increase of chart II-3.
Page 75 bottom left
Switch to Chart II and knit from row 1 to row 102. Knit the red part from changed row 1 to row 12 after the last widening of Chart II-3.
75 pages
hem
From XS to 3XL
Adjustment stage (row 103 of RS Chart II) Changed the red part (row 13 after the last widening of RS Chart II-3)
next row in column 4 for all sizes
Knit rows 3 and 4 four more times.
(End of knitting is row 24 after the last widening in Chart II-3)
[ Invision Skirt ]
Waist measurement is added to choose your size easily.
Body measurement (waist) = 28½ (30¼, 32½, 34½, 36)” / 72.5 (78, 82, 87.5, 91.5) cm
I added the waist size to make it easier to choose the size.
Size: Waist = 72.5 (78, 82, 87.5, 91.5) cm
[Phōs]
Updated chart keys below.
MC: Audio
CC: Boreal